Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:03.30 05:19
NIGERIA | LAGOS:03.30 06:19
EGYPT | CAIRO:03.30 07:19
UAE | DUBAI:03.30 09:19
SRI LANKA | COLOMBO:03.30 10:49
SINGAPORE:03.30 13:19
ENGLAND | LONDON:03.30 06:19
RUSSIA | MOSCOW:03.30 09:19
CHINA | BEIJING:03.30 13:19
AMERICA | Los Angels:03.29 22:19
AMERICA | New York:03.30 01:19
BRAZIL | San Paulo:03.30 02:19