Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:01.31 12:22
NIGERIA | LAGOS:01.31 13:22
EGYPT | CAIRO:01.31 14:22
UAE | DUBAI:01.31 16:22
SRI LANKA | COLOMBO:01.31 17:52
SINGAPORE:01.31 20:22
ENGLAND | LONDON:01.31 13:22
RUSSIA | MOSCOW:01.31 16:22
CHINA | BEIJING:01.31 20:22
AMERICA | Los Angels:01.31 05:22
AMERICA | New York:01.31 08:22
BRAZIL | San Paulo:01.31 09:22