Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:11.04 13:05
NIGERIA | LAGOS:11.04 14:05
EGYPT | CAIRO:11.04 15:05
UAE | DUBAI:11.04 17:05
SRI LANKA | COLOMBO:11.04 18:35
SINGAPORE:11.04 21:05
ENGLAND | LONDON:11.04 14:05
RUSSIA | MOSCOW:11.04 17:05
CHINA | BEIJING:11.04 21:05
AMERICA | Los Angels:11.04 06:05
AMERICA | New York:11.04 09:05
BRAZIL | San Paulo:11.04 10:05