The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:01.31 12:22
NIGERIA | LAGOS:01.31 13:22
EGYPT | CAIRO:01.31 14:22
UAE | DUBAI:01.31 16:22
SRI LANKA | COLOMBO:01.31 17:52
SINGAPORE:01.31 20:22
ENGLAND | LONDON:01.31 13:22
RUSSIA | MOSCOW:01.31 16:22
CHINA | BEIJING:01.31 20:22
AMERICA | Los Angels:01.31 05:22
AMERICA | New York:01.31 08:22
BRAZIL | San Paulo:01.31 09:22