The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:03.30 05:39
NIGERIA | LAGOS:03.30 06:39
EGYPT | CAIRO:03.30 07:39
UAE | DUBAI:03.30 09:39
SRI LANKA | COLOMBO:03.30 11:09
SINGAPORE:03.30 13:39
ENGLAND | LONDON:03.30 06:39
RUSSIA | MOSCOW:03.30 09:39
CHINA | BEIJING:03.30 13:39
AMERICA | Los Angels:03.29 22:39
AMERICA | New York:03.30 01:39
BRAZIL | San Paulo:03.30 02:39